The construction of the Swaasthya Hospital has begun.
After the final review and proofreading of the architectural drawings and obtaining necessary permissions from various departments, the excavation for basement and the footings is underway. The excavation has been done till the founding level.
Of the 27 columns planned, nine plain cement columns will be erected in a few days. The work is progressing at a very good pace and the pre-monsoon schedule is on track.
Here are some photos of the excavation in progress.